Im building a 3v dome out of 7/8 steel tube, wich will only take 10 mins to erect, as so far with no fixings in place i can stand on the top!!
[ Comments 7 ]
posted by
admin
18/12/2011 01:51:48
posted by
domone
24/12/2011 21:08:57
posted by
domone
24/12/2011 21:15:01
Here is another pic of the 3v dome hubs, to be in batch production soon. they are TIG welded steel with detents like on tent poles., making for a speedy and simple assembly. All components to be bright zinc plated. More pictures to follow. Enquiries welcome !
posted by
domone
24/12/2011 21:19:44
Better pic of drilled detent holes.
posted by
Domone
17/01/2012 21:32:29
Forgot to mention that the cfircular boss in center is flaush on the outside to prevent abrasion to canvas. And they will/may have a small bar welded across to enable hanging of internal drapery lighting etc, and even hammocks!.
posted by
Talumbaugh
24/01/2013 20:19:07
Is there a web site with more information on these hubs and struts?
posted by
domone
02/03/2013 07:57:32
Hi, no web site yet. You can contact Dom through this email blacksmiff@hotmail.com or phone 07930578877. Thanks.